A Critical Literature Review Exploring the Challenges of Research in Delays and Cost Overruns in Construction Projects
José Luis Ponz-Tienda1* and Adriana Gómez-Cabrera1,2
1Department of Civil & Environmental Engineering, Los Andes University, Colombia.
2Department of Civil Engineering, Pontificia UniversidadJaveriana, Colombia.
Submission: July 24, 2017; Published: September 18, 2017
*Corresponding author: José Luis Ponz-Tienda, Department of Civil & Environmental Engineering, Los Andes University, Address: Cra 1 N° 18A-12, Bogotá-Colombia-111711, Tel: 57-1-332 4312 Ext 1874, Fax number: -57.1-332 4313 Email: jl.ponz@uniandes.edu.co
How to cite this article: José L P-T, Adriana G-C.A Critical Literature Review Exploring the Challenges of Research in Delays and Cost Overruns in Construction Projects. 2017; 1(5): 555575. DOI: 10.19080/CERJ.2017.01.555575
Abstract
Construction project delays and cost overruns represent a constant source of concern for project developers and several researches have been developed in order to identify causes of these kind of deviations worldwide. In this paper, a literature review was developed in order to identify the most significant factors that generate overruns in construction projects and the methods applied to identify them. The results include a synthesis of internal and external factors, a critical evaluation of different investigations and recommendations for future research.
Keywords: Construction projects; construction delays; construction cost overruns
Introduction
Construction projects are constantly faced with the difficulties stemming from construction delays and cost overruns, representing a source of uncertainty for construction professionals and project developers. In light of the large number of variables involved Enshassi et al. [1], it is difficult to maintain full control over the performance of civil projects. A deep knowledge and understanding of the significant factors that lead to delays and cost overruns, would facilitate the establishment of actions that minimize the negative effects that can lead to disputes and claims leading to trials or the total abandonment of the project.
The scientific literature reports delays and overruns as common occurrences worldwide. In India, over 40% of construction projects are facing time overrun Iyer & Jha [2] for groundwater construction projects of Ghana, it was reported that 75% of the projects have deviations in cost and time Frimpong et al. [3]. The average of time overrun in large construction projects in Saudi Arabia is between 10% and 30% of the original duration Assaf & Al-Hejji [4]. For international projects, a research conducted by Ahsan & Gunawan [5] found that real duration exceeds overall planned in average 33.37%. For Indonesian construction projects, Kaming, Olomolaiye, Holt & Harris [6] found that only 54.5 percent of the projects are completed on time, and Olatunji [7] found that in Nigeria 55 per cent of 137 analyzed projects had overruns. The Gaza Strip, an area with complex problems and limited resources that affect project performance, faced similar problems reported on other countries [1] and on the other hand, developed countries, such as the United Kingdom, failed to meet time and cost expectations Ola wale & Sun [8]. Finally, Memon & Rahman [9] found that developing countries present considerably higher cost overruns when compared to developed countries. In Table 1 and Table 2 are exposed the most significant factors in terms of project delays and cost overruns respectively.
* W/E/M = workers/equipment/ materials.
In respect of the applied research methodology, it generally consists on a survey for project stakeholders in order to ascertain, in their opinion, the significant factors that lead to time and cost deviations. After that, through descriptive statistics like frequency and importance index, a list of the most significant factors is established. Other methods applied consist in case studies Kaliba et al.[10], factor analysis Doloi et al. [11], ANOVA Ahsan & Gunawan [5], KRUSKAL WALLIS Shehu Z et al. [12] and fuzzy logic to estimate the probability of delay that was also considered by Gunduz et al. [13].
Discussion
Construction is currently considered one of the most important sectors as far as economic growth and job creation are concerned, but frequently delays and cost overruns are reported generating multiple problems and even the total abandon of the project. The negative effects of this situation make the research in this topic a need.
Many of the factors generating delays and cost deviations are related to planning and, in light of these findings, enough time and resources should be dedicated to the initial phases of project life cycle. Other external factors such as: currency fluctuations, weather or geopolitical problems remain beyond stakeholders control and there are in some cases unpredictable. For these factors, the focus should be on the analysis and definition of risks that may arise during project development.
The investigation related to cost and time deviations has to establish correlations among factors and aspects such as project scale, business size and project type (public, private, residential, infrastructure), contract type, among others. Other important aspect to consider is the relationship between the different factors identified, like which of them generate the occurrence of others and which of them are presented simultaneously [14-31].
Conclusion
Case studies are an effective method for providing indepth knowledge about a topic and are appropriate to identify the causes of deviations in projects from primary sources. In this way, research can be continued with focus on creating or identifying mitigation measures that can benefit those involved in construction. There is still open to research the challenge for developing a unified methodology to deal with the problem of time and cost overruns in construction projects. In this line, there is an essential need for a model that allow the comparison of results, characterizing construction projects and focused on data science, taking into account not only the physical characteristics, but also the organization and contract conditions, besides geographical locations, size, sector and adjudication process.
However, in spite of the great importance of this research topic for construction industry, the analyzed literature does not allow the research community to compare the obtained results, and apply corrective measures based on lessons learned in other studies.
References
- Enshassi A, Mohamed S, Abushaban S (2009) Factors affecting the performance of construction projects in the Gaza strip. Journal of Civil Engineering and Management 15(3): 269-280.
- Iyer KC, Jha KN (2006) Critical Factors Affecting Schedule Performance: Evidence from Indian Construction Projects. Journal of Construction Engineering and Management 132(8): 871-881.
- Frimpong Y, Oluwoye J, Crawford L (2003) Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study. International Journal of Project Management 21(5): 321-326.
- Assaf SA, Al-Hejji S (2006) Causes of delay in large construction projects. International Journal of Project Management 24(4): 349-357.
- Ahsan K, Gunawan I (2010) Analysis of cost and schedule performance of international development projects. International Journal of Project Management 28(1): 68-78.
- Holt GD, Harris FC, Kaming PF, Olomolaiye PO (1997) Factors influencing construction time and cost overruns on high-rise projects in Indonesia. Construction Management and Economics 15(1): 83-94.
- Olatunji OA (2008) A comparative analysis of tender sums and final costs of public construction and supply projects in Nigeria. Journal of Financial Management of Property and Construction 13(1): 60-79.
- Olawale YA, Sun M (2010) Cost and time control of construction projects: inhibiting factors and mitigating measures in practice. Construction Management and Economics 28(5): 509-526.
- Memon AH, Rahman IA (2014) SEM-PLS Analysis of Inhibiting Factors of Cost Performance for Large Construction Projects in Malaysia: Perspective of Clients and Consultants. The Scientific World Journal 2014: 1-9.
- Kaliba C, Muya M, Mumba K (2009) Cost escalation and schedule delays in road construction projects in Zambia. International Journal of Project Management 27(5): 522-531.
- Doloi H, Sawhney A, Iyer KC, Rentala S (2012) Analysing factors affecting delays in Indian construction projects. International Journal of Project Management 30(4): 479-489.
- Shehu Z, Endut IR, Akintoye A (2014) Factors contributing to project time and hence cost overrun in the Malaysian construction industry Journal of Financial Management of Property and Construction 19(1): 55-75.
- Gunduz M, Nielsen Y, Ozdemir M (2015) Fuzzy Assessment Model to Estimate the Probability of Delay in Turkish Construction Projects. Journal of Management in Engineering 31(4): 4014055.
- Aibinu AA, Odeyinka HA (2006) Construction Delays and Their Causative Factors in Nigeria. Journal of Construction Engineering and Management 132(7): 667-677.
- Gunduz M, Nielsen Y, Ozdemir M (2013) Quantification of Delay Factors Using the Relative Importance Index Method for Construction Projects in Turkey. Journal of Management in Engineering 29(2): 133-139.
- Aziz RF, Abdel-Hakam AA (2016) Exploring delay causes of road construction projects in Egypt. Alexandria Engineering Journal 55(2): 1515-1539.
- Bagaya O, Song J (2016) Empirical Study of Factors Influencing Schedule Delays of Public Construction Projects in Burkina Faso. Journal of Management in Engineering 32(5): 5016014.
- Marzouk MM, El-Rasas TI (2014) Analyzing delay causes in Egyptian construction projects. Journal of Advanced Research 5(1): 49-55.
- Fallahnejad MH (2013) Delay causes in Iran gas pipeline projects. International Journal of Project Management 31(1): 136-146.
- Batool A, Abbas F (2017) Reasons for delay in selected hydro-power projects in Khyber Pakhtunkhwa KPK. Pakistan Renewable and Sustainable Energy Reviews 73: 196-204.
- Sambasivan M, Soon YW (2007) Causes and effects of delays in Malaysian construction industry. International Journal of Project Management 25(5): 517-526.
- Kazaz, A, Ulubeyli S, Tuncbilekli NA (2012) Causes of Delays in Construction Projects in Turkey. Journal of Civil Engineering and Management 18(3): 426-435.
- Mahamid I, Bruland A, Dmaidi N (2012) Causes of Delay in Road Construction Projects. Journal of Management in Engineering 28(3): 300-310.
- Abd El-Razek ME, Bassioni HA, Mobarak A. M (2008) Causes of Delay in Building Construction Projects in Egypt. Journal of Construction Engineering and Management 11(2): 45-50.
- Sambasivan M, Deepak TJ, Salim AN, Ponniah V (2017) Analysis of delays in Tanzanian construction industry. Engineering Construction and Architectural Management 24(2): 308-325.
- Kamanga M, Steyn W (2013) Causes of Delay in Road Construction Projects in Malawi. Journal of The South African Institution of Civil Engineering 55(3): 79-85.
- Chan DWM, Kumaraswamy MM (1997) A comparative study of causes of time overruns in Hong Kong construction projects. International Journal of Project Management 15(1): 55-63.
- Doloi H (2013) Cost Overruns and Failure in Project Management: Understanding the Roles of Key Stakeholders in Construction Projects. Journal of construction engineering and management 139(3): 267279.
- Alghonamy A (2015) Cost Overrun in Construction Projects in Saudi Arabia: Contractors' Perspective. International Journal of Engineering & Technology IJET-IJENS 15(4): 35-42.
- Alinaitwe H, Apolot R, Tindiwensi D (2013) Investigation into the Causes of Delays and Cost Overruns in Uganda's Public Sector Construction Projects. Journal of Construction in Developing Countries 18(2): 33-47.
- Derakhshanalavijeh R, Cardoso JM (2016) Cost overrun in construction projects in developing countries, Gas-Oil industry of Iran as a case study. Journal of Civil Engineering and Management 23(1): 125-136.